Interface foundations / Tasks
Workspace
Review the prototype, validate assets, prepare the handoff.
Tasks
3 in this project| Task | Status |
|---|---|
| In review | |
| Needs check | |
| Ready |
Prepare preview
SimulatedA local progress example. No files are processed or uploaded.
Ready
Feedback & recovery
Choose an example; these controls never test a real connection.